Friday, 19 November 9:00 - Overview Mike/Ed (30) Discussion (30) Hardware: Recent Scintillator Developments Mingfang (30) Electronics developments + Chicago plans Kelby (20) KSU Plans Glenn (20) Questions and R&D Issues Identified in Proposal (simulation) Software development Matt (15) Modelling the Gd gamma cascade Nick (15) Calibration: simulation work, Josh (20) remaining issues 12:30 - 1:30 Lunch 1:30 - Weak Mixing Angle Issues Janet (20) Anti-nu - electron scattering Peter (15) Background overview Tim (20) Veto calculations Peter (20) Simulating an active muon veto Steve S. (15) Liquid Scintillator option for veto counters Mike L. (20) Alternative PMT and Scintillator Options Steve (20) Civil Engineering: Bore Hole Status Jon/Ed (20) Preparations for Design and Build Study Chris (30) Detector Engineering Discussion of resources, plans Maury, all (40) Saturday, 20 November 9:00 - Working group organization, etc. All Short-term plans of groups Outreach Milestones
Video and audio: We will use the ESNET IP Ad-hoc bridge as we did for the last meeting.
Video: dial 826763 at 384 kbs Voice only: 1-510-883-7860; at the prompt enter 826763 follwed by # sign.